1. The installation location of the equipment shall not be installed in a nearby place where there is a high concentration of VOC release; There is no strong vibration around, no direct sunlight or other heat sources direct radiation and strong electromagnetic radiation. No flammable, corrosive gas atmosphere. There is no strong air convection around, wet steam, and less dust.
2. Equipment power supply: AC 380V (±10%), frequency: 50±2%Hz, three-phase four-wire protective ground wire. Ground resistance≤4Ω, *High power: 30KW, equipped with independent air switch. Provide an independent power distribution switch cabinet (within 5 meters of the equipment) and be responsible for the power connection outside the equipment.
3.Provide cooling water supply pressure of 0.32~0.45Mpa, water temperature ≤ 30°C, pipe diameter of 1 inch, water flow rate of more than 10m3/h.
The tap water source interface is Φ25mm, and the water pressure is ≥ 0.2Mpa.
4. The buyer's installation site needs to be leveled in advance before the supplier's construction, and assist the supplier in the on-site installation of equipment;
5. Humidification water: use purified water or distilled water, this equipment is equipped with a set of pure water filter;
6. Working environment: 5~35°C temperature, ≤85%R.H humidity
7. Prepare the corresponding capacity of the air switch, the capacity is 80A
8. Prepare the water inlet and drainage pipeline project in advance
9. The user needs to provide fresh air outlets and exhaust outlets
10. Atmospheric pressure: 80kPa~106kPa